Peinado Construction

Midpoint | Arlington, TX

ARCHIVE Download

November 27th, 2018

December 27th, 2018

January 28th, 2019

February 28, 2019

March 27, 2019

Progression Photos

March 27, 2019

April 27, 2019



Download full-resolution images here (129mb zip)

Download full-resolution images here (143mb zip)


High Resolution Aerial Map

This map is from Nov 27th, 2018. An updated map from Dec 27th is available for $75.

PienadoMap_Orthomosaic_export_WedNov28070824.jpg

Download full-resolution map here (65mb zip)


3D Model

This model is from Nov 27th, 2018. An updated model from Dec 27th is available for $55.

An interactive and shareable 3D Model of the facility. Annotations can be added.


Video


Elevation Map & Volumetrics

This map is from Nov 27th, 2018. An updated elevation map from Dec 27th is available for $75.

Spoil Pile

.359 Acres or 15,652.02sqft

4,042.6 cubic yards

pile.PNG